Skip to content
ELORA DIGITAL

Insights

How long does it take to build a website?

Published 7 min readBy

A small business website takes 1 to 6 weeks with us. Starter sites take 1 to 3 weeks, business websites 3 to 6. See each stage and what to prepare to go faster.

Key takeaways

  • A starter website takes 1 to 3 weeks with us, and a business website of 5 to 8 pages takes 3 to 6 weeks from the signed scope.
  • The build itself is rarely the slow part. Content, feedback and domain access decide whether a site lands at the fast or the slow end.
  • Having your text, photos, logo and domain login ready on day one is the single biggest thing you can do to launch sooner.
  • The timeline is written into the scope with the fixed price, so you know the launch date before you pay anything.

A small business website takes 1 to 6 weeks to build with us, depending on its size. A starter website of one or two pages takes 1 to 2 weeks, a three-page starter website takes 2 to 3 weeks, and a business website of 5 to 8 pages with its own design takes 3 to 6 weeks from the signed scope. Those are calendar weeks, and most of the difference between the fast end and the slow end comes from how soon the content and the decisions arrive. This article walks through the stages, what stretches them and what you can prepare.

WebsiteTimelinePrice (ex GST)
Starter website, one or two pages1 to 2 weeksfrom $900
Starter website, three pages2 to 3 weeksfrom $1,500
Business website3 to 6 weeks$4,000 to $8,000

A starter website is quicker because it uses a shared page layout instead of a custom design, so there is no design stage to approve. A one-page website suits a business that needs to be found, explain what it does and take enquiries. A business website has its own design, a content management system so you can edit pages yourself, and room for services, pricing, bookings and articles.

Anything with sign-in, a database or customer accounts is a web app, not a website, and takes longer. How long it takes to build an app covers those.

A website runs through a shorter version of the five steps on our process page. Here is how they fall across a typical four-week business website.

A call about what the business does, who the site is for and what a visitor should do next: call, book, or ask for a quote. That call ends in a written scope with a page plan, a fixed price and a launch date. Websites sit under $10,000, so there is no paid workshop. This is also the week to collect the logo, photos and any existing text, and to confirm who holds the login for the domain name. If you do not have one yet, how to choose and register a domain name covers it.

You see the design for the home page and one inner page, then approve it or ask for changes. Changing your mind here costs an hour. Changing it after every page is built costs days, which is why the build does not start until the design is approved.

The pages are built and your real text and photos are loaded, along with the contact and booking forms, spam protection, analytics and the SEO setup: titles, descriptions, structured data and the sitemap. You can watch the pages take shape in your client portal.

You read every page on your phone and your computer, we fix what you find, and the site goes live on your own domain. Pointing a domain at a new site usually takes effect within hours, though it can take a day or two to reach everyone. You get a walkthrough of how to edit the site and a 30-day warranty.

A three-week project runs design and content collection side by side. A six-week project has more pages, more custom design, or bookings and payments to connect and test.

  • Content that is not ready. This is the most common cause by a long way. A page cannot be finished without its text, and writing about your own business always takes longer than expected. If you want help, say so at the start, because writing the content with you is part of what moves the price within its range.
  • Photos. Stock photos are quick and look like everyone else's site. Real photos of your work, your team or your premises are worth waiting for, but book the photographer in week one, not week three.
  • Slow feedback. A design that waits a week for approval moves the launch by a week.
  • Too many reviewers. One person who can say yes keeps the dates. A committee that meets fortnightly does not.
  • Domain and email access. If nobody knows who registered the domain or where the email is hosted, launch day stalls. Find the logins early.
  • Extra features added late. A booking system or online payments decided in week three belongs in a second stage, or in a new scope with a new date.

Have these ready before the discovery call and a site lands at the fast end of its range:

  • Not done: Your logo as a file, and your brand colours if you have them
  • Not done: A list of your services with a sentence or two on each
  • Not done: Prices, or a decision not to show them
  • Not done: Ten or more real photos
  • Not done: Opening hours, service area, phone and email
  • Not done: The login for your domain name, or the name of whoever has it
  • Not done: Two or three websites you like, and what you like about them
  • Not done: One person who makes the final call

Imagine a physiotherapy clinic with two practitioners that wants a six-page website with online bookings.

A hypothetical example

This clinic is made up to show how a plan is built. It is not a client project, and the figures are our published ranges, not a quote.

WeekWhat happensWhat you do
1Discovery call, written scope, page planSend the logo, photos and service list
2Design for the home page and a service pageApprove the design within two days
3Build all six pages, load the content, connect bookingsSupply practitioner bios and prices
4Testing on phones, fixes, launch on the clinic's domainRead every page, make a test booking

That is four weeks, inside the 3 to 6 week range, at a price quoted within $4,000 to $8,000 and fixed once the scope is signed. If the bios arrive a fortnight late, the same project takes six weeks without anyone working more slowly. How much a website costs explains how the price is built up, and what website hosting costs covers the running costs after launch.

Not when the speed comes from being prepared. It is worse when the speed comes from skipping steps: no design approval, placeholder text left in, forms nobody tested, no check on a phone. A site that launches a week early with a contact form that does not send has cost you every enquiry in that week.

A website builder you set up yourself can be live in a weekend, and for a business that needs less than a $900 site, that is often the right choice. What you usually give up is the time you spend learning the tool and the setup around the pages: search engine basics, speed, spam protection and analytics. When comparing quotes, the questions to ask a web designer include what is in the timeline and who supplies the content.

Describe your website on our quote page and you will have an estimate range within one business day. After a discovery call, the written scope sets out the pages, the fixed price and the launch date, and a senior developer builds the site. Every milestone, file and message sits in your client portal, so you can see where the project is on any day. From the end of the warranty, the care plan keeps the site hosted, backed up and updated if you would rather not look after it yourself.

Frequently asked questions

How long does it take to build a website?

With us, a starter website of one or two pages takes 1 to 2 weeks, a three-page starter website 2 to 3 weeks, and a business website of 5 to 8 pages takes 3 to 6 weeks from the signed scope. The timeline is written into the scope with the fixed price before work starts.

Can a website be built in a week?

A one or two page starter website on a shared page layout can, when the text, photos and logo are ready on day one and one person approves it. A 5 to 8 page business website with its own design cannot be done well in a week, because design approval, content and testing each need a few days.

What delays a website the most?

Content. The text, photos, prices and logo usually come from the business, and a site cannot launch with empty pages. Slow feedback on the design and missing logins for the domain name are the next most common causes.

How long does it take for a new website to show up on Google?

It varies and nobody outside Google controls it. A new site is usually found within days to a few weeks once it is submitted in Search Console, and ranking for competitive searches takes much longer than appearing for your own business name. We set up Search Console and the sitemap at launch and do not promise rankings.

What happens after the website is launched?

A 30-day warranty covers defects in our work at no charge. It sits alongside the consumer guarantees under the Australian Consumer Law and does not limit them. From the end of the warranty, the care plan can keep the site hosted, backed up and updated for $300, $700 or $1,500 a month ex GST.

About the author

Anis Setoodeh

Founder, full-stack developer, ELORA DIGITAL

Anis is a full-stack developer who works across Next.js, Vue, ASP.NET Core and React Native. Before ELORA DIGITAL he built and shipped Reckonly, Scentena and Near Space, and he studied a double degree in Computer Science and Game Development at Swinburne.

About the founder

Get new articles by email

New articles on building web and mobile apps, and occasional studio news. We send a link to confirm your address first.

Tell us about your project

Describe it in your own words and get a reply with an estimate range within one business day.